group_fulgor_history
  Milestones  
  • Implementation of €60 million investment plan for the manufacture of high voltage submarine cables
  • Certification of Safety Management and Health and Safety Management System for the Company (OHSAS 18001)
  • Submarine electric interconnections for the islands of Thasos and Aegina with the continental power distribution grid in collaboration with the Public Power Corporation (DEI)
  • Acquisition of 100% of the company’s share capital from Cablel® Hellenic Cables Group
  • Commission to Fulgor S.A., following an International Tender from the Public Power Corporation (DEI), of the turnkey project for the submarine interconnection “Kos – Kalymnos” with two submarine cables 12/20KV of 32 Km in total length, priced at approximately 95,000,000 Euros
  • Registration of patents to the Hellenic Industrial Property Organisation for factory connections of medium voltage submarine cables with XLPE insulation and fibre-optic submarine cables
  • Completion of underwater interconnection for the route Revythousa – Ag. Triada (Eleusina) on behalf of the Public Gas Corporation (DEPA). For the first time in Greece, a composite medium voltage (12/20KV) power cable with XLPE insulation is produced, which includes a telephone fibre-optic cable for the control of the final section of the power cable
  • Collaboration with Siemens for the manufacture and laying of submarine fibre-optic cables in the Aegean islands, with total length of 770km.
  • Completion of underwater cable interconnection for Kavala – Prinos (Oil rig), for the needs of North Aegean Petroleum Company.
  • Completion of the first underwater cable interconnections, Kos – Kalymnos (25,4km) and Paros – Naxos (15km) etc, on behalf of the Public Power Corporation (DEI).
  • Relocation of the Company’s facilities in private property of 190 acres in the area of Soussaki, Agioi Theodoroi, Corinth.
  • Establishment of the Company in private property in Agios Ioannis Rentis, Athens, Attica.